The layout is comprised of three different sections that are uniquely different. Two of the sections are portable while the third is a 7x21 ft permanent section located at the clubhouse. The permanent layout is a single track mainline running through rugged mountain terrain to showcase how grand scenery can dwarf the trains in smaller scales.
Canadian Pacific Railway is the primary host railroad for the layout. Locomotives and rolling stock are chosen from what can be seen in Southern Alberta and Southeastern British Columbia during the era in which the layout is modelled. One exception is that VIA Rail provides passenger service to the layout.
The layout is not modelled after any particular location but draws inspiration from terrain located in the Rocky Mountains and the eastern slopes to the prairies.
The era is set between the years of 2000 and 2010.
The layout is primarily made up of run through unit trains with some local switching and manifest operations. This type of operation helps fit with the mission of the layout which serves as a portable to be taken to shows where there is constant running. The design of the portable section of the layout also is conducive to this type of operation.
A 4 x 16 foot portable layout that can be transported to model railway shows. As it is more of a showcase layout, the portable section is designed for multiple trains running through a combination of urban and rural scenes (due to space constraints, one module is only joined when not at the clubhouse).
Mainline Run unknown
Mainline Minimum Radius 15"
Maximum Grade 0.0%
Track Peco Code 80 Flex
Minimum Turnout Peco Short
Style Island (Portable) Walk-in (Clubhouse)
Benchwork Modular – 4 4x4 Tabletop
Height 39"
Gary’s Mod consists of a 3x5 portable section that is designed to be connected to the main portable layout. The section features a small cement quarry with a simple double loop. It is designed to be self contained and can be run independent of the main layout.
This module is not required for the Main Layout to be operable.
Mainline Run unknown
Mainline Minimum Radius 9"
Maximum Grade 3.0%
Track Atlas Code 80
Minimum Turnout Atlas Snapswitch
Style Island (Portable) Walk-in (Clubhouse)
Benchwork Modular – 3x5 Tabletop
Height 39"
The permanent section of the layout currently consists of a 7x21 foot space that hosts a single track mainline that transitions from the prairies to rugged mountain terrain.
Mainline Run unknown
Mainline Minimum Radius 15"
Maximum Grade 2.0%
Track Peco Code 80 Flex
Minimum Turnout Peco Medium
Style Walk-in
Benchwork Open Grid andTabletop
Height 36" - 47"